Description: MTN switch centers in 3 locations in Ghana
Scope:
Design and manage all M&E installation.
2.5 MW/ 0.4 Kv energy center control
Backup generation synchronization MV & LV distribution systems
2 x 1.25 MVA generators
Period: 2010
Design and manage GSM civil works expansion
Construction of GSM sites
Period: 2006-2010
Scope:
Period: 2010
Description: Ghana Telecom ( Vodafon)
Scope:
Period: 2006-2010